How to install a Promove Hammer

December 10, 2020

A correct installation of the breaker is essential to obtain the best performance and to ensure optimal safety conditions.
You will need to connect a flow meter to the excavator in place of the breaker and set the number of liters per minute necessary for that specific hammer at a certain pressure which is indicated in the use and maintenance operations manual.
It is very important for the correct functioning of the hammer to set the relief valve of the excavator as well. It can be found on the excavator back side following the inlet hose and has to be adjusted at 50 bar more than the working pressure of the breaker.

This video, shot directly in the quarry, describes the installation procedure of a Promove hammer.
-----------------
VALID FOR EQUIPMENT NOT EQUIPPED WITH SMART VALVE
xP60 / xP70 / xP101 / xP150 / xp200 / xP300 / xP400 / xP600 / xP800 / xP1000 / xP1200 / xP1500 / xP1700 / xP2000 / xP2400 / xP3100 / xp4500 / xP7000

On this website we use first or third-party tools that store small files (cookie) on your device. Cookies are normally used to allow the site to run properly (technical cookies), to generate navigation usage reports (statistics cookies) and to suitable advertise our services/products (profiling cookies). We can directly use technical cookies, but you have the right to choose whether or not to enable statistical and profiling cookies. Enabling these cookies, you help us to offer you a better experience. Cookie policy